Project Data

  • Kharkiv, 2019

  • Object: meat production shop.

  • Base: old marble floor.

A task

It is required to perform the install of a polymer floor, on the old base of marble chips.

Coating requirements for a butcher shop

  • Antibacterial industrial polymer floors.

  • Seamless polymer floors.

  • Waterproof floors for food production.

  • Anti-slip floors for the butcher shop.

  • Wear-resistant floors for industrial loads.

  • Chemical resistant floors for production.

  • Temperature resistant floors for industrial premises.

Solution

The customer decided to use a polyurethane-cement based system, UCRETE UD 200.

Ucrete polyurethane flooring system

What is ucrete flooring?

  • Polyurethane coating thickness: 6 mm.

  • Color: grey.

  • More about the UCRETE UD 200 system, read in our section "World of Technology"

 UCRETE UD 200 | Полы для колбасного цеха

UCRETE UD 200 | food floor

Stages of work when applying polyurethane coatings

Foundation preparation

  • The mechanical processing of marble chips was carried out using a grinding machine.

  • When grinding the floor, an industrial vacuum cleaner was used for instant cleaning and removal of cement dust in the production workshop.

  • The final cleaning of the marble chips floor was also additionally carried out using an industrial vacuum cleaner.

 UCRETE UD 200 | Полы для колбасного цеха

Grinding marble chips

Primer application

On the prepared base, apply a three- component primer, with a quick setting time, UCRETE PRIMER FS.

  

 

Application of UCRETE UD 200

  • After the primer was dry, they proceeded to apply a polyurethane-cement coating, with a quick curing (4-24 hours), Ucrete 200.

  • By distributing the polymer mixture with a spatula and squeegee, the required thickness of the coating was maintained, according to the project.
 

 

Summary 

  • After 24 hours, the premises of the production workshop were put into operation.

  • New, industrial, wear-resistant, polyurethane coating, will serve the customer for more than one year, and will also satisfy all the requirements and wishes of the valiant inspection bodies.

 UCRETE UD 200 | Полы для колбасного цеха

Floors for meat production

 "Apply efficient flooring technology in meat production"

If you liked this article and found it helpful,
share it on social networks - this will help your friends to know about it and support our project.
 
Thank you!